Site icon Enviromesh

The Hive Installation

The Hive Installation Welded Gabion Landscaping Benches Enviroslope
SHARE

PROJECT DETAILS

Client: Stage One (UK)

Artist: Wolfgang Buttress

Architect: Building Design Partnership

Location: Richmond London

Date: March 2016

The multi-award winning ‘Hive’ installation was designed by UK based artist, Wolfgang Buttress, whose inspiration was drawn from the latest scientific research into the health of honeybees. In particular, the bee’s importance in ‘feeding the planet’ and by extension, the feeding of the human population. The exhibit fuses science and art into a form that enables visitors to fully immerse themselves in the story of our dependence on honeybees and the role they play as pollinators. The multi-sensory (audio and visual) experience vividly encapsulates the lives of honeybees.

Enviromesh became involved in the project through a contact at Tradeline Construction, the ground working company. Tradeline themselves had been approached by Stage One (the main contractor) to landscape the site, based on the architects’ designs. Meetings between the companies and the architects prior to construction, resulted in Enviromesh being asked to design, supply and install a gabion amphitheatre; the surrounding gabion benches/seating; as well as the reinforced earthworks slope retaining system, which would enable a mix of meadow grass and wildflowers to grow over it.

Services provided by Enviromesh

Project Build Components

Exit mobile version